DATE
(FROM TO) |
NAME OF COMPANY/EXTENT OF RESPONSIBILTY | POSITION | NATURE OF BUSINESS | COST OF PROJECT |
April 2011
TO Sept 2011 |
EMPLOYER : HENSEK + LAMA JOINT VENTURE (AKWA – IBOM STATE)
DESCRIPTION:Construction of transformer base, fence, road works and associated works for NIPP. RESPONSIBILITY: · Interpretation of both structural and architectural drawings for the execution of the project · Checking of reinforcement bending schedule and arrangement, adjusting and correcting structural details · Supervision and co-ordination of site work to ensure that construction procedures were followed, good quality workmanship and optimum use of the workers. · Ensuring that quality materials were used during the construction( quality control)
|
Trainee Engineer (Assistant Site Engineer) | CONSTRUCTION
CIENT :National Integrated power project( NIPP) |
COST : 1.2 billion Naira
|
Sept 2011
TO June 2013 |
EMPLOYER : BUILDSAFE NIG LTD (30 BODE THOMAS STREET SURULERE LAGOS)
DESCRIPTION: Supervision of world class commercial project with basement (P&G head office) · Resident Engineer onsite · Supervision of the construction works/management from foundation to the completion and ensure that designed specification were adhered to, good quality work were carried out. · Certification of formwork and reinforcement before casting and attending /organizing site meetings |
PROJECT ENGINEER | CONSULTING
CLIENT : LANDMARK GROUP
|
COST : 1.1 billion Naira
|
June 2013
TO Jan 2014 |
EMPLOYER : BUILDSAFE NIG LTD(30 BODE THOMAS STREET SURULERE LAGOS)
DESCRIPTION: Renovation of Line 2 · Resident Engineer on site · Supervision of the construction works/management from foundation to the completion and ensure that designed specification were adhered to, good quality work were carried out. · Certification of formwork and reinforcement before casting and attending /organizing site meetings · Solving contractors issue if need be on site · Ensuring contractors work safely without accident on site
|
PROJECT ENGINEER | CONSULTING
CLIENT : NIGERIAN BOTTLING COMPANY ASHEJIRE IBADAN (NBC)
|
COST : 60 Million Naira
|
Jan 2014
TO August 2014 |
EMPLOYER : BUILDSAFE NIG LTD+NATUHAB CONSULTANTS LTD(30 BODE THOMAS STREET SURULERE LAGOS)
DESCRIPTION: Expansion Project · Supervision of storm water drains, road construction andearth works · Ensuring that designed specification were adhered to for good and quality work were carried out. · Ensuring our team worked safely without accident on site · Tracking of trucks to avoid stealing on site with the use of computer aided design software · Preparing worker wages as at when due · Prepare and send daily work progress to clients
|
ASSITANT SITE MANAGER/ CLERK | CONSULTING + CONSTRUCTION
CLIENT : NIGERIAN BREWERIES AMA |
COST : 600 Million Naira
|
August 2014
TO March 2015 |
EMPLOYER : BUILDSAFE NIG LTD
DESCRIPTION: Structural integrity assessment, Re-design and supervision of Existing warehouse Re- construction · Establish the cause of cracks. · Recommend additional steel members to stiffen existing beams and introduce steel columns. · Solves contractors issue if need be on site · Ensuring contractors work safely without accident on site · I was responsible for writing of the reports which were usually reviewed by the Project Partners before adopting them · Ensuring all advice and reconstruction methodologies are maintained on site. · Quality assurance. · Structural design and detailing
|
PROJECT ENGINEER | CONSULTING
CLIENT : LEVENTIS MOTORS AND KNEIPE NIG LTD
|
COST : 30 Million Naira
|
March 2015
TO MAY 2016 |
EMPLOYER : BUILDSAFE NIG LTD(30 BODE THOMAS STREET SURULERE LAGOS)
DESCRIPTION: DEPOT UPGRADE · Quality Control. · Recommend additional steel members to stiffen existing beams and introduce steel columns. · Solves contractors issue if need be on site · Ensuring contractors work safely without accident on site · Supervision of Loading bay, Drivers Toilet, Checking Bay and other related works · Design and detailing of Oil Separator and associated components · Utility Mapping · Project monitoring Using Microsoft Project software · Preparation of Bill of quantities · Attending meetings and competently communicate with Clients, Contractors
|
PROJECT
ENGINEER |
CONSULTING
CLIENT : NIGERIAN BOTTLING COMPANY MUSHIN (NBC)
|
COST : 250 Million Naira
|
MAY 2016
TO AUGUST 2016 |
EMPLOYER :ASO ROCK MERCHANT( 25 DANIEL NATHANIEL STREET LEKKI PAHSE 1, LAGOS)
DESCRIPTION: Construction of Inland sea Port in Ejinrin, Epe LGA, Lagos. · Planning and strategies to kick off project · Utility Mapping · Preparation of Bill of quantities · Attending meetings and competently communicate with Contractors
|
CIVIL/STRUCTURAL ENGINEER
|
CONSULTING
CLIENT :ASO ROCK MERCHANT LTD
|
COST : 3 Billion Naira
|
AUGUST 2016
TO DEC 2017(TILL DATE) |
EMPLOYER : RITSPEC NIG LTD(11B OGUNDOJU STREET SURULERE LAGOS)
DESCRIPTION: · CONSTRUCTION OF 4 BED ROOM FLAT AT SURULERE · STRUCTURAL INTEGRITY ACCESSMENT FOR MRS SMITH AT ELEKON BEACH · DESIGN OF 2 SUSPENDED FLOOR VICARAGE FOR ST ANDREWS ANGLICAN CHURCH MOBIL ROAD APAPA, LAGOS · DESIGN OF CULLET BAY FOR RIMA CONSTRUCTION COMPANY AT AGBARA, OGUN STATE. · DESIGN OF LIFT SHAFT FOR RIMA CONSTRUCTION COMPANY AT AIR PORT ROAD LAGOS · DESIGN OF WARE HOUSE FOR RIMA CONSTRUCTION COMPANY AT AGBARA OGUN STATE. · DESIGN OF 1 SUSPENDED FLOOR BLOCK OF FLATS FOR ARCH OMO AT OGUN STATE · DESIGN OF 2 SUSPENDED FLOORS (6 FLATS X 2 NOS ) FOR ARCH EMEKA AT AMUWO ODOFIN ESTATE LAGOS.
|
MANAGING DIRECTOR | ||
AUGUST 2016
TO APRIL 2019 |
EMPLOYE : NATUHAB CONSULTANTS LTD(SUIT 19, MOTOR WAYS PLAZA OPPOSITE 7 UP IKEJA, LAGOS)
DESCRIPTION: OTA DRAINAGE UPGRADE,13 KM WASTE WATER PIPE LINE WORKS AT AMA BREWERY, RE CONSTRUCTION OF FPS WAREHOUSE AT OLD BREWERY ENUGU STATE AND CONSTRUCTION OF NEW FPS WARE HOUSE AT AMA BREWERY ENUGU STATE.
· Quality Control. · Introduce steel columns. · Ensuring work safely without accident on site · Project monitoring Using Microsoft Project software · Preparation of Bill of quantities · Attending meetings and competently communicate with Clients, Contractors · Tracking and controlling of materials for all sites · Purchase of material and necessary tools on site · Ensure that engineers comply with the design standard provided by the client and OVA ARUP designer · Manages plants and machineries for site use. · Designs of some structural elements on site which will be approved my OVA ARUP
|
PROJECT CONTROLLER | CONSULTING
CLIENT:NIGERIAN BREWERY PLC
|
COST : OVER980 million Naira
|
APRIL 2019
TO TILL DATE |
EMPLOYER: NATUHAB CONSULTANTS LTD (SUIT 19, MOTOR WAYS PLAZA OPPOSITE 7 UP IKEJA, LAGOS)
DESCRIPTION: CELLAR 7 DEW STAIRCASE CONSTRUCTIONAT OTA AND OVER 5000 SQUARE METERS OF RE REPLACEMENT AT PACKAGING HALL 2, 5 AND 6 AT IBADAN BREWERY, OYO STATE.
· Quality Control. · Introduce steel columns. · Ensuring work safely without accident on site · Project monitoring using Microsoft Project software · Preparation of Bill of quantities · Tracking and controlling of materials for all sites · Purchase of material and necessary tools on site · Management of plants and machineries for site use.
|
PROJECT CONTROLLER | CONSULTING
CLIENT:NIGERIAN BREWERY PLC
|
COST : OVER50 million Naira
|